REQUIREMENTS FOR MASTS/TOWERS ERECTION
Application Letter to include Site type, Proposed Site addresses, Site Coordinates(Long&Lat), Site layout sketched drawing with dimension and NCC approved clearance from existing buildings, tower heights and antenna heights & azimuths. Letter must be addressed to the General Manager, LAGOS STATE INFRASTRUCTURE MAINTENANCE & REGULATORY AGENCY.
Site Analysis Reports (Soil Test.) To be provided by LASIMRA'S consultants
Detailed Structural Drawings of Mast members/Site Location
Detailed Tower Foundation Design and Installation Manual NB: Drawing must be Certified by a COREN Engineer.
Site Assessment Report showing Electrical layout, Earthing layout, Proposed Project Implementation Plan. NB: Drawing must be certified by a COREN Engineer
Letter of consent from the Lessor (Landlord), Immediate Neighbor and Community (CDA) approving the construction of the mast/tower
Receipt of Payment for Building Permit
Receipt of Application Fee
Evidence of Subcontractor's Registration with LASIMRA
Evidence of Personal Protective Equipment (Safety signs, warning tapes and PPE for onsie inspection)
SCHEDULE OF FEES FOR PERMIT
S/N | ACTIVITY | AMOUNT (₦) |
1 | Application Fee | 50,000.00 |
2 | 1-50m | 1,500,000.00 |
3 | 50-70m | 2,115,000.00 |
4 | Above 70m | 8,823,500.00 |
5 | Rooftop | 2,115,000.00 |
6 | Site Assesment Report (SAR) | 1,233,750.00 / Site |
7 | LASIMRA Administrative and Project Management fees applicable in all LASIMRA activities outline above | 15% of Permit fees |
SCHEDULE OF FEES FOR SITE ASSESSMENT AND INTEGRITY TEST
1 | SITE ASSESSMENT | |
PRICING | 1,233,750.00 / Site | |
2 | INTEGRITY TEST | |
PRICING | NIL |